| Fa

LF-Fuel nozzle

LF-Fuel nozzle

Section Accessories
ATA chapter
73-15-01
Check & Test Total Time
14 (days)
Overhaul Total Time
21 (days)
Quantity (min)
10 Each

Part Number

Delevan:37112 Honeywell:2-300-677-04
Delevan:46795 Honeywell:2-300-677-06
Delevan:48207 Honeywell:2-310-011-01
Delevan:56520 Honeywell:2-310-071-01
Delevan:59117 Honeywell:2-310-098-01
Delevan:152805 Honeywell:2-310-213-01

Repair Description

CHECK & TEST

Incoming Receival Acceptance
Visual Check to Detect the Defects
External Cleaning
Check (Include Visual Inspection, Dimential Inspection, FPI)
Performing Functional Test
Issue of Certificate
Preservation & Vacuum Packing

OVERHAUL

Incoming Receival Acceptance
Disassembly
Ultrasonic Cleaning
Check (Include Visual Inspection, Dimential Inspection, FPI)
Repair of Primary and Secondary seal surfaces
Primary Seal Surface to Flange Dimensional Requirements
Correct undersize dimension
Damage on Air Cap
Machining Dimensions for Removal of Air Cap
Repair damage to threads
Correct high primary flow rate
Polishing of Exit Orifice
Down Calibration of Secondary
Correct low secondary flow rate
Missing Parts Replacement*
Assembly
Performing Functional Test
Issue of Certificate
Preservation & Vacuum Packing.

| Fa