| Fa

CF6-50

CF6-50

Section Accessories
ATA chapter
73-13-05
Check & Test Total Time
14 (days)
Overhaul Total Time
21 (days)
Quantity (min)
10 Each

Part Number

Repair Description

CHECK & TEST

Incoming Receival Acceptance
Visual Check to Detect the Defects
External Cleaning
Check (Include Visual Inspection, Dimential Inspection, FPI)
Performing Functional Test
Issue of Certificate
Preservation & Vacuum Packing.

OVERHAUL

Incoming Receival Acceptance
Disassembly
Ultrasonic Cleaning
Check (Include Visual Inspection, Dimential Inspection, FPI)
REMACHINE AND REPAIR PRIMARY BODY
MACHINE GAS HOLE IN PRIMARY BODY
REMACHINE AND REPAIR SHROUD/SECONDARY BODY
FLAME SPRAY SHROUD/SECONDARY BODY
PRIMARY BODY AND SHROUD/SECONDARY BODY MATCH
FITTING REPLACEMENT
REWORK FOOTED CONNECTOR AND FITTING
REWORK FOOTLESS CONNECTOR AND FITTING
REWORK FOOTED CONNECTOR AND FITTING TO FOOTLESS CONFIGURATION
REWORK FOOTED SUPPORT FOR FOOTLESS CONNECTOR CONVERSION
SUPPORT CONVERSION; ADD ANTI-ROTATION PIN HOLE
VALVE ADAPTER REPLACEMENT
SUPPORT REPAIR
LOCATING PIN/PRIMARY TUBE REPLACEMENT
VALVE LINER REPAIR
STRAIGHTEN PRIMARY TUBE
REPAIR LOCKWIRE HOLE
REMOVE SHROUD/SECONDARY BODY FROM NOZZLE ASSEMBLY
WELD BUILDUP FOR COMPONENTS
REPLACE PRIMARY ADAPTER IN SUPPORT
REPAIR THREADS
LAPPING AND POLISHING REPAIRS
REMOVE RAISED METAL
BENCH REPAIR (GRIND, ETCH FOR ZYGLO, ECT.)
REPAIR DEFECTIVE WELD
RECOMMENDED REPAIR PROCEDURE FOR MATCHING SHROUD AND SECONDARY TO PRIMARY REPLACEMENT
REPLACE HEAT SHIELD
Missing Parts Replacement*
Assembly
Performing Functional Test
Issue of Certificate
Preservation & Vacuum Packing.