| Fa

CF6-80

CF6-80

Section Accessories
ATA chapter
73-11-47
Check & Test Total Time
14 (days)
Overhaul Total Time
21 (days)
Quantity (min)
10 Each

Part Number

Parker:1968M49P03 PN: 6980200E3
Parker:1968M49P11 PN: 6980200E11
Parker:1968M49P10 PN: 6980200E10
Parker:1968M49P09 PN: 6980200E9
Parker:1968M49P05 PN: 6980200E5
Parker:1968M49P04 PN: 6980200E4
Parker:1968M49P08 PN: 6980200E8
Parker:1968M49P07 PN: 6980200E7
Parker:1968M49P06 PN: 6980200E6

Repair Description

CHECK & TEST

Incoming Receival Acceptance
Visual Check to Detect the Defects
External Cleaning
Check (Include Visual Inspection, Dimential Inspection, FPI)
Performing Functional Test
Issue of Certificate
Preservation & Vacuum Packing.

OVERHAUL

Incoming Receival Acceptance
Disassembly
Ultrasonic Cleaning
Check (Include Visual Inspection, Dimential Inspection, FPI)
REPAIR DEFECTIVE WELD
REMACHINE COVER END OF SUPPORT
REMACHINE CONNECTOR
REMOVAL OF METERING SET AND REMACHINE OF SUPPORT TIP END
REPAIR PRIMARY BODY
MACHINE COVER AND ELBOW OR COVER AND FITTING - SUPPORT END
MACHINE COVER AND ELBOW - CONNECTOR END
SHROUD AND SECONDARY BODY REPAIR
REPAIR DEFECTIVE THREADS
REPLACE FITTING
REPLACE FITTING
VALVE CARTRIDGE POLISHING
FLANGE REPAIR
REPLACE COVER/ELBOW ASSEMBLY
REPAIR DEFECTIVE WELD
RECOMMENDED REPAIR PROCEDURE FOR MATCHING SHROUD AND SECONDARY TO PRIMARY REPLACEMEN
REPAIR FUEL NOZZLE AND INLET STRAINER
PRIMARY ADAPTER REPLACEMENT
Missing Parts Replacement*
Assembly
Performing Functional Test
Issue of Certificate
Preservation & Vacuum Packing.

| Fa