| Fa

CF6-80

CF6-80

Section Accessories
ATA chapter
73-11-47
Check & Test Total Time
14 (days)
Overhaul Total Time
21 (days)
Quantity (min)
10 Each

Part Number

Repair Description

CHECK & TEST

Incoming Receival Acceptance
Visual Check to Detect the Defects
External Cleaning
Check (Include Visual Inspection, Dimential Inspection, FPI)
Performing Functional Test
Issue of Certificate
Preservation & Vacuum Packing.

OVERHAUL

Incoming Receival Acceptance
Disassembly
Ultrasonic Cleaning
Check (Include Visual Inspection, Dimential Inspection, FPI)
REPAIR DEFECTIVE WELD
REMACHINE COVER END OF SUPPORT
REMACHINE CONNECTOR
REMOVAL OF METERING SET AND REMACHINE OF SUPPORT TIP END
REPAIR PRIMARY BODY
MACHINE COVER AND ELBOW OR COVER AND FITTING - SUPPORT END
MACHINE COVER AND ELBOW - CONNECTOR END
SHROUD AND SECONDARY BODY REPAIR
REPAIR DEFECTIVE THREADS
REPLACE FITTING
REPLACE FITTING
VALVE CARTRIDGE POLISHING
FLANGE REPAIR
REPLACE COVER/ELBOW ASSEMBLY
REPAIR DEFECTIVE WELD
RECOMMENDED REPAIR PROCEDURE FOR MATCHING SHROUD AND SECONDARY TO PRIMARY REPLACEMEN
REPAIR FUEL NOZZLE AND INLET STRAINER
PRIMARY ADAPTER REPLACEMENT
Missing Parts Replacement*
Assembly
Performing Functional Test
Issue of Certificate
Preservation & Vacuum Packing.

| Fa