| Fa

CFM56

CFM56

Section Accessories
ATA chapter
73-11-42 , 73-11-43
Check & Test Total Time
14 (days)
Overhaul Total Time
21 (days)
Quantity (min)
10 Each

Part Number

Repair Description

CHECK & TEST

Incoming Receival Acceptance
Visual Check to Detect the Defects
External Cleaning
Check (Include Visual Inspection, Dimential Inspection)
Performing Functional Test
Issue of Certificate
Preservation & Vacuum Packing.

OVERHAUL

Incoming Receival Acceptance
Disassembly
Ultrasonic Cleaning
Visual Check
Repair Threads
Lapping and Polishing Repairs
Remove Burrs or Raised Metal
Repair Defective External Weld
Weld Buildup for Short Components
Flange Repair
Main Housing Repair
Special Clean
Repair Damaged Threads*
Repair Damaged Seal Surfaces*
Repair Damaged Locating Sleeve (Replacement) *
Removal Of Burrs or Rased Metal*
Polish Swirler Assembly*
O-Ring, Helicoil Insert, Restrictor, Missing Parts Replacement*
Assembly
Performing Functional Test
Issue Of Issue of Certificate
Preservation & Vacuum Packing.

| Fa