| Fa

JT8D

JT8D

Section Accessories
ATA chapter
784025-821216-774204
Check & Test Total Time
14 (days)
Overhaul Total Time
21 (days)
Quantity (min)
10 Each

Part Number

Repair Description

CHECK & TEST

Incoming Receival Acceptance
Visual Check to Detect the Defects
External Cleaning
Check (Include Visual Inspection, Dimential Inspection)
Performing Functional Test
Issue of Certificate
Preservation & Vacuum Packing.

OVERHAUL

Incoming Receival Acceptance
Disassembly
Ultrasonic Cleaning
Check (Include Visual Inspection, Dimential Inspection)
Support Sealing Faces Repair
Support Weld Repair Of Plug Weld And Adjacent Area
Support Coupling Conical Seat Repair
Fuel Nozzle And Support Assembly; Removal Of Scoop, Nozzle Nut
Fuel Nozzle Nut/Nozzle Body Plasma Coat Repair
Fairing Replacement (Removal/Installation)
Support−Tube Coupling Replacement
Fuel Nozzle Sealing Face And Flange Repair
Support−Wrenching And Nut Lock Slots Crack Weld Repair
Fuel Nozzle Nut/Air Nozzle Rear Surface Replacement
Repair Of Cracks At Bottom Corners Of Annulus
Support; Secondary Fuel Passage Crack Repair
Fuel Nozzle Support Fairing Crack Repai
Fuel Nozzle And Support, Assembly And Disassembly
Fuel Nozzle Support − Thread Weld Repair
Air Nozzle Assembly And Disassembly
Support, Wrenching And Nut Lock Slots Crack Blend Repair
Fuel Nozzle Support − Crack and Wear Blend/Weld Repair
Nozzle Support Welded Scoop Assembly And Disassembly
Fuel Nozzle Support Assembly, Weld Repair
Missing Parts Replacement*
Assembly
Performing Functional Test
Issue of Certificate
Preservation & Vacuum Packing.

| Fa