| Fa

PW

PW

Section Accessories
ATA chapter
73-10-05 , 73-11-08
Check & Test Total Time
14 (days)
Overhaul Total Time
21 (days)
Quantity (min)
10 Each

Part Number

Repair Description

CHECK & TEST

Incoming Receival Acceptance
Visual Check to Detect the Defects
External Cleaning
Check (Include Visual Inspection, Dimential Inspection, FPI)
Performing Functional Test
Issue of Certificate
Preservation & Vacuum Packing.

OVERHAUL

Incoming Receival Acceptance
Disassembly
Ultrasonic Cleaning
Check (Include Visual Inspection, Dimential Inspection, FPI)
Crack Repair of the Sheath
Surface Restoration of the Adapter (Adapter body and Sheath)
Repair of Axial Scratches (ID of Inlet ports and Drain)
Surface Restoration of the Fuel Nozzle Body
Restoration of the sealing Surface
Repair of the Strainer Sleeve Grooves
Repair of the Adapter Threads
Repair of the Adapter Threads
Replacement of the Straight Headless Pin
Surface Repair of the Aircap, the Lockring and the Sleeve
Correction of Narrow Spray Angle
Correction of Streaks and Voids
Correction of High Flow
Repair of the Fuel Nozzle Threads
Crack Repair at Crimp Area
Surface Restoration of the Exit Face
Surface Restoration of the Plate
Replacement of the Lockring
Surface Restoration of the Plug and/or Correction of High Flow
Replacement of the Sleeve
Missing Parts Replacement*
Assembly
Performing Functional Test
Issue of Certificate
Preservation & Vacuum Packing.

| Fa