Section Accessories
ATA chapter
73-13-41
Check & Test Total Time
14 (days)
Overhaul Total Time
21 (days)
Quantity (min)
10 Each

Part Number

2A0994
2A1637
2A3453
2A2250
2A3448

Repair Description

CHECK & TEST

Incoming Receival Acceptance
Visual Check to Detect the Defects
External Cleaning
Check (Include Visual Inspection, Dimential Inspection)
Performing Functional Test
Issue of Certificate
Preservation & Vacuum Packing.

OVERHAUL

Incoming Receival Acceptance
Disassembly
Ultrasonic Cleaning
Check (Include Visual Inspection, Dimential Inspection)
Remove And Install, Or Replace The Fuel Strainer Element And Or Metering Plug
Repair The Mounting Flange Sealing Face
Repair The Fuel Inlet Fitting Conical Seat
Missing Parts Replacement*
Assembly
Performing Functional Test
Issue of Certificate
Preservation & Vacuum Packing.
Overhaul Plus: Weld Repair The Fairing Cracks*
Replace The Hardface On The Outer Swirler
Replace The End Cap Heatshield
Replace The Fairing*
Replace The Outer Air Swirler*
Weld Repair The Cracks On The Inner Heat Shield*
Replace The Fuel Inlet Fitting And Insert*
Locally Fabricate And Replace The End Cap Heatshield